Abstract

Every industry keen to maximize their company profit by fulfils the customer’s satisfaction by perform a very good project deliverable. However, very limited researches on uncertainty in environmental issues (EI) probably could turn as a biggest problem for company, especially in late delivery of project completion for construction industry (CI). Uncertainty factors could be mapped by many causes and affects which known or unknown, statically to totally ignorance. Previously, most of research on uncertainty have been model their factors of uncertainties but pay no attention to the EI, whereas in the real cases all the factors must controlled and manageable even it is in-deterministic or non-realistic. Therefore, the modelling of uncertainty factors in EI on late delivery for CI is very important to studied, and it will be considered to be used as the guidance for decision makers when they are facing of the problems that related to uncertainties. This paper will purpose the conceptual model on progress to the modelling of uncertainty factors in EI on late delivery for CI. The uncertainty of environmental can split into two categories; acts of God and acts of humans.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.