Abstract
Problems often exist in construction of transportation tunnels, such as the effect of new tunnels constructed close to existing structures. Solving this magnificent problem by carefully choosing tunnel construction methods will be beneficial to minimize effects on existing structures while ensuring the newly constructed tunnel is both time-consuming and economical. Three representative engineering methods-the benching tunneling method, the Center Diaphragm method and the Cross Diaphragm method-are compared in controlling the settlement of new tunnel vault and the deformation of the existing tunnel. Finally checking the simulation results by comparing with field measurement data.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.