Abstract

The present paper reports the results of an investigation into the effectiveness of serving peak loads in the variants of providing nuclear power plants with a base load through unloading condensing power plants, combined heat and power (CHP) plants, combined-cycle thermal power plants during night-time off-peak hours, the use of the off-peak electric power for power and heat supply, and water electrolysis with the use of hydrogen and oxygen for production of the peak electric power, as compared with the variant of the development of pumped storage hydropower plants.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call