Abstract

Abstract The CMS Resistive Plate Chambers (RPC) system consists of 912 double-gap chambers. The challenging constrains on the design and operation of this system imposed the development of a complex Detector Control System to assure the operational stability and reliability of a so large and complex detector and trigger system . The final layout and functionality of the CMS RPC DCS as well as the operational experience during the detector's commissioning and first phase of LHC operation are presented here.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call