Abstract

Production managers face the growing trend of rapid-response orders and inevitable production defects and failures; they must carefully measure these factors’ effects to minimize operating expenditures and operational disruption. Inspired by assisting producers decide the optimal runtime policy under these real situations, this work investigates the collective impact of rework, expedited-rate, external source, and machine failures on such a specific fabrication system. A partial outsourcing and expedited manufacturing rate are considered in the studied system to reduce the batch fabricating time. Additionally, defects rework and repair failure machines are implemented to retain the quality and avoid production disruption. Our research scheme consists of (1) developing a model for the mentioned manufacturing characteristics; and (2) analytical and optimization techniques for deciding the best batch runtime decision by minimizing the system’s overall expenses. Lastly, we provide numerical examples to demonstrate the model’s applicability and disclose important, in-depth characteristics that facilitate managerial decision-making.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.