Abstract

The variation of temperature distribution in the cup-shaped frozen soil wall is real-timely monitored during the whole process of the horizontal freezing reinforcement project in Yixian Bridge Station, the first phase in Line 2 of Nanjing Subway. The development characteristic of the temperature field at different depth is analyzed, and the formation time and developing speed of the frozen soil wall is further calculated. The monitoring results show that, the average growth rate of the temperature field at the interface between the frozen soil and the underground continuous wall is significantly faster than the one in the cylinder reinforced area.There is significant differences in the average growth rate of temperature field in the frozen soil wall at different area of the reinforcing plates.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.