Abstract
This paper proposes an agent-based metaheuristic to solve large-scale multi-period supply chain network design problems. The generic design model formulated covers the entire supply chain, from vendor selection, to production–distribution sites configuration, transportation options and marketing policy choices. The model is based on the mapping of a conceptual supply chain activity graph on potential network locations. To solve this complex design problem, we propose Collaborative Agent Team (CAT), an efficient hybrid metaheuristic based on the concept of asynchronous agent teams (A-Teams). Computational results are presented and discussed for large-scale supply chain networks, and the results obtained with CAT are compared to those obtained with the latest version of CPLEX.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.