Abstract

The current building industry is essentially changing due to implementation of new approach, which is predominantly motivated by the need to reduce its negative environmental impact. The paper is focused on the experimental evaluation of carbonation resistance in terms of accelerated tests performed on the concrete on the basis of blended binding system incorporating milled limestone. The used commercially produced cement was additionally modified by the limestone powder. The obtained results confirmed, that currently used design standards are convenient to real carbonation process, however further clinker replacement by the milled limestone causes significant loss of the durability of the hardened concrete.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.