Abstract

In the new energy power generation process, because it’s difficult to balance the dynamic energy and the system operation cost is high, the paper puts forward the basic structure of the commercial virtual power plant based on BESS system, then discuss the proper run mode of the virtual power plant to maximize the total revenue. On the basis of the electricity price of the Chinese typical areas and the cost of the BESS system, the paper builds the mathematical model of the economic benefits of the virtual power plant based on BESS system. This paper also builds the regulation optimization simulation model of the virtual power plant based on the aim of maximizing the overall profit of the energy supply and demand sides, and calculates the dynamic balance elements and optimization optimal power output value based on optimization algorithm. The simulation results show that using the virtual power plant based on BESS system to peak load shifting and control frequency is feasible in the economy.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.