Abstract

By the effect of the optimization of bus scheduling, bring forward evaluation index model to evaluate optimization results,the corresponding algorithm of the model is given. This evaluation index is included transport capacity match,average transfer time,effective time-use law.analytic hierarchy process to integrate indicators into a comprehensive evaluation index,is used and built the evaluation index model about the optimization of bus scheduling.the use of indicators model line scheduling algorithm to optimize the evaluation made a simple algorithm.The three indicators in this model belong to quantitative techmical indicators,overcome the line network optimization index can not evaluate the program for dynamic scheduling its easy to evaluate program of bus scheduling,with strong practicality.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call