Abstract

Summary We present the application of dendrochronological dating of the renovation and construction works of churches in the Kaunas and Vilnius regions of Lithuania. The model for the estimation of the missing rings of Scots pine was used in Lithuania for the first time. We have assessed 18 timber cross-sections from nine churches, which were used for the constructions from the second half of the 17th to 19th c. The oldest wood samples were dated from St. Michael’s Church in Vilnius (1668±4) and St. George, the Martyr, (Bernardine) Church in Kaunas (1693±3). The aim of this study was to compare the results of the investigation of timber samples from 9 churches with archival sources and literature data and to reveal the renovation history of the buildings. The study of written historical sources has revealed a lack of recorded building and reconstruction phases of the churches. This fact was later confirmed by the results of dendrochronological dating. The dating of the timber revealed undocumented reconstruction dates in Zapyškis church (1791±3), St. George, the Martyr, (Bernardine) Church in Kaunas (1711±4), St. Anne Church in Skaruliai (1693±3) and Vilnius Cathedral (1814±4).

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.