Abstract

The Bridge of Aspiration between the Royal Ballet School and the Royal Opera House in Covent Garden comprises an aluminium beam of highly complex geometry and a series of aluminium and timber square frames forming a twisted box arrangement (Fig. 1). This paper describes the design and construction, and addresses the reasons for selecting aluminium as the primary structural material. The innovative design had to deal with several complex issues and permit installation in a single operation to minimise disruption to the function of the Opera House.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.