Abstract
The Breakthrough of the Long and Large Diameter Shield-driven Tunnel under High Water Pressure in Constructing of the Trans-Tokyo Bay Highway and the Metropolitan Area Outer Discharge Channel
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have