Abstract
Assembly lines can be employed successfully in sheltered work centres to better include persons with disabilities in the labour market as well as to improve production efficiency. The optimal assignment of a heterogeneous workforce is known as the assembly line worker assignment and balancing problem (ALWABP). These assembly lines are characterised not only by a heterogeneous workforce, but also by high levels of absenteeism, which makes it more difficult to obtain stable and efficient line balancing solutions. In this paper, an extension of the ALWABP to minimise the expected cycle time under uncertain worker availability is proposed. We model this problem as a two-stage mixed integer program, and propose local search heuristics for solving it. Computational experiments show that stochastic modelling can help to improve the line’s efficiency and that the proposed heuristics produce good results for instances of practical size.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.