Abstract

The need for the estimation of the future state of electric power supply in the power system can no longer be avoided. This is due to the inevitable operational, maintenance, planning and expansion obligations of the power sector. In this work, the future trend of power supply by the 33kV feeders that supply power to the customers in the central part of Edo State, Nigeria was forecasted from 2020 to 2030 using Artificial Neural Network. The findings showed that there will be a 13.84% reduction in the power supplied by the utility provider by 2030 if the current trend was sustained. To avoid the adverse impact of such a negative performance by the power supplier, there is a need to increase system capacity by constructing mini grids and implementation of other contingency plans within the study area.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.