Abstract

With the expansion of power system, the system simulation, fault simulation will be one of the most important work to ensure the operation of Yunnan Power Grid safe and stable.It is also proposed newer and higher requirement to the hydroturbine prime mover and governor models in the Yunnan Power Grid which is based on hydroturbine. In this paper, taking the Luoma River Hydropower Second Stage #2 as an example, a new modeling method of hydroturbine prime mover and governor through parameters- measured is proposed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.