Abstract

The text introduces the process of comparison and selection of foundation treatment scheme, combining with example of foundation treatment in Zhangzhuang pumping station, and elaborates the detailed design steps and calculation way of cement-soil mixing pile,the economy benefits is very significant through settlement check, composite static load test, static load test of single pile, the bearing capacity of composite foundation meets the design demand.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.