Abstract

AbstractThe tasks carried out by NTL-Hanau, which has been working in the field of transport of radioactive material for more than 20 years, are described. The NTL Group procedures, which were drafted nearly 10 years ago, have been developed into a comprehensive Quality Assurance system. This paper describes the QA system following ISO 9001 and IAEA Safety Series No 37 but which, for German QA requirements, has also to conform to German KTA Standard No 1401. The preparation of shipments includes, inter alia, the planning of the transport, flask utilisation, the provision of transport vehicles and the assignment of personnel. The flask handling procedures are also described, including the essential QA step of identifying fuel elements before loading. NTL-Hanau generally acts as the consignor of each shipment and this entails the provision of services such as the performance of final flask checks, completion of transport documentation and proper labelling of the package. In addition NTL-Hanau is continuousl...

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.