Abstract

Based on the quality survey of the working procedure of interior hole grinding of the ceramic shaft bush parts, this paper analyzes and studies it by the quality control tools such as Pareto diagram and Cause and effect diagram, and finds out the main deficiency indicator. The main influencing factor is that the verticality of the interior hole is Ultra-poor in the Process quality deficiencies. A series of the testing data of this deficiency indicator has been analyzed in order to obtain the factors influencing the deficiency indicator. Finally, comparison is made between the quality status before and after implementing improvement measures and measures of adjusting processes are taken to greatly improve the effect and the product qualified rate, which can provide reference for enterprises to improve the quality in the production process.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.