Abstract
The problem of transporting steel reinforcement for construction purposes has always been eminent in construction projects. In this study, the transportation model was applied while shipping steel reinforcement from three supply locations to three construction sites owned by Julius Berger construction limited, in the city of Port Harcourt. The study was done for 100-ton truck load of steel reinforcement bars with standard 12m lengths and diameters 8mm to 40mm. This was from the three selected steel depots in Port Harcourt. The costs of transporting the steel reinforcement bars were analyzed using the basic steps of simplex algorithm for solving transportation problems. The initial and optimum feasible solutions were obtained. The Stepping Stone method was used for the optimum solution after three consecutive iterations, which amounted to $3,813 or (₦2,897,880 as of March 2023). The result was compared with that obtained from Microsoft Excel solver. There was no difference between the two results.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.