Abstract

Currently, dangerous reservoirs in Yunnan province are experience one serious common issue: leakage in dam body and dam foundation. To explore solutions for this issue, this study investigated the effects of the application grouting technology on dam seepage and reinforcement using case study of Montenegro reservoir project. Based on numerical simulation (STAB2005 Lizheng software), we can get results after having reinforcement, the dam saturation line was reduced after the reinforcement and the anti-seepage ability was improved significantly in both body and foundation of the dam. Furthermore, numerous successful case studies were reported using grouting technology. In conclusion, grouting technology is highly recommended as a construction method to solve leaking problems in reservoir engineering.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call