Abstract
This paper presents a new method to improve embankment on deep soft clay in China. The method, briefly named D-M method, combines the prefabricated vertical drains (PVD) and the cement deep mixing method (DMM) together to consolidate deep soft soil foundation. The short deep mixing columns improve the shallow soft soil and long PVDs accelerate the dissipation of excess pore pressure in the deeper soft soil layers. To evaluate the efficiency of the D-M method, a numerical study was conducted using the design parameters obtained from the Huaian-Yancheng Highway project by the 2-dimensional finite element software Plaxis. Results showed that the new method succeeds in consolidating deep soft soils below the deep mixing columns and improving the stability of the highway embankment.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.