Abstract

This article takes the Han Hall project at the Wuhan International Expo Center as a case study to illustrate how digital technology has been applied in various stages of the construction process, including conceptual design, construction drawing design, engineering construction, and operation and maintenance management. It demonstrates the role of digital technology in the construction of public buildings.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call