Abstract

Purpose This study aims to excoriate, define and delineate the main drivers of “change” in commercial construction projects and generate guidelines on how to minimise exposure to the associated adverse effects upon project stakeholders. Design/methodology/approach The research adopts mixed doctrines through a combination of epistemological lenses, embracing two primary philosophical stances: interpretivism, to identify the primary drivers of change based on a systematic literature review and a post-positivist, inductive approach to analyse the results of change within a Joint Contracts Tribunal (JCT) Design and Build (D&B) construction project case study. Findings The causal nexus of change during the construction phase is assessed and delineated; the key affecting factors are thematically grouped under headings: extent and severity; time in relation to implementing; instigating party; individual(s) responsible for managing the change; reason for the change; available resource; recoverable or non-recoverable; contract/project type; and type of client. Following this, the effects of change on key elements of the project are encapsulated and recommendations for adaptations which may provide improved experiences are offered. Originality/value The study tackles the common issue of managing the deleterious effects of change on commercial construction projects, defining management techniques to minimise stakeholder tribulation.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.