Abstract

Take one of Grade III-A general hospitals in Wuhan as the research object with auditing the hospital's energy consuming system. It can be proved that the energy consumption per unit area is 27kgce/m2 , analysis of typical of the hospital exterior envelope, lighting systems, central heating and air conditioning system for hospital energy, gave priority to recycle the boiler flue gas heat and condensation water, natural light using, exterior windows transforming and installation of the sub-metering systems for energy saving renovation. The comprehensive transformation energy-saving rate is 31.71%. Energy saving quantity is 318.01tce. A total investment is 4.3948 million yuan. The payback period is 2.5 years.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.