Abstract

This paper describes the operation effect of KEPCO(Korea Electric Power Corporation) FACTS devices in the Korean power system. At the year of 2009, KEPCO is ready for commercial operation of 345kV 100MVA STATCOM at Mi-Geum substation and 345kV 200MVA SVC at Dong-Seoul substation. In case of Mi-Geum and Dong-Seoul substation, these sites are very close. Therefore, it is necessary that the additional analysis including interaction and cooperation is implemented. To do it, a detailed EMTDC simulation model was developed and variant analysis was implemented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.