Abstract

This paper evaluates the scheduling of parts in a Flexible Job Shop (FJS) with non-zero setup costs, varying arrival rates and multiple objective functions. The Shortest Processing Time (SPT), Longest Processing Time (LPT), First-in, First-out (FIFO) and Earliest Due Date (EDD) scheduling rules are evaluated with respect to minimising the number of early jobs and optimising the due-date performance while simultaneously approximating Just-in-Time (JIT) inventory levels. We show in this paper that when the setup costs are not zero, depending on which objective is given priority, different machine loading configurations optimise system performance.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.