Abstract

This study aims to analyze the level of public demand for railroad transportation in Krueng Geukuh, Dewantara District, North Aceh Regency. The survey method used is the dynamic survey method and static survey, the data analysis method used is using the Load Factor method. The results showed that the travel speed using the Train was 5.3 minutes from each station. The time between the train distance and other public vehicles is 60 minutes. Travel time required in 1 km is 1.88 minutes. Keywords: Load Factor, Travel Speed, Headway, Travel Time, Frequency, Wakru Wait

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.