Abstract

The goal of this study is to determine how much the level of efficiency the production line at PT. X by using the Moodie young approach. The three components of the method - Line Efficiency, Balance Delay, and Smooth Index - are utilized to assess the degree of balance in the manufacturing line. The findings indicated that there were 5 work stations with 7 work elements in the real production line configuration, with a Line Efficiency of 40.29%, a Balance Delay of 59.70%, and a Smoothness Index of 9578.22. As a consequence of the research utilizing the Moodie Young approach, the new production lines are composed of 3 work stations with 7 work elements and a Line Efficiency result of 67.15%, Balance Delay of 32.84%, and Smoothness Index of 4449.71. Keywords: Line Balancing, Moodie Young, Line Efficiency, Balance Delay, Smooth Index

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call