Abstract

Based on the surveied data of the G202 Heihe to Dalian on the Beisanjia station in Fushun City, Liaoning Province, the traffic conditions of the observation section of the station are analyzed. The continuous data is compared with the axle-load survey data, and the service life of the asphalt pavement in the year of data is analyzed. In order to make full use of real-time axle load-traffic survey data and accurately predict the remaining service life of asphalt pavement in an accurate and real-time manner, it is of great value to develop targeted asphalt pavement maintenance and protection countermeasures.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call