Abstract

Ground vibrations arising from excavation with blasting is one of the fundamental problems in the mining industry. Therefore, the prediction of ground vibration components plays an important role in the minimization of environmental complaints. In this study, 582 events were recorded during limestone production at a quarry (Akyol Quarry) during a period of time. The blasting parameters of these shots were also carefully recorded. During the statistical analysis of the collected data, three predictor equations proposed by the United States Bureau of Mines (USBM), Ambraseys–Hendron and Langefors–Kihlstrom were used to establish a relationship between peak particle velocity and scaled distance described by these prediction equations. As a result of this analysis, the most powerful relationship was determined and proposed to be used in this site. And also, this equation was used in the derivation of the practical blasting charts specific to this site as a practical way of predicting the peak particle velocity and maximum charge amount per delay for future blasting.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.