Abstract

The article analyzed the forced state of the surrounding rock and the tunnel lining for Fu longping double-decked tunnel by the Elasto-plastic finite element method. In the analysis, DP’s yield criterion was employed for the elasto-plastic characteristics of materials. It studied the construction method with the theory, and guided the construction for the double-decked tunnel ,too.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.