Abstract
One of the fundamental problems faced by the province of South Sulawesi is the factor of accessibility, so the role of bridges is quite important. For this reason, the budget planning for standard bridge construction projects also needs to be efficient in terms of preparation and accurate in terms of budget. The Cost Significant Model is one of the total construction cost estimation models that relies more on the prices that have the most influence on the total project cost as the basis for estimation. In general, this study uses data from steel frame bridge construction projects in South Sulawesi Province to formulate a mathematical model with linear regression analysis so that it can be used in the process of estimating similar projects going forward. The Estimation Model which is formed from the regression analysis and the Cost Significant Model in this study, namely; Y = 3.884 (X7) + 0.989 (X8) - 65515.372. With; Y = Estimated Total Cost (Rp/m); X7 = Reinforcement Work Cost (Rp/m); X8 = Steel Frame Structure Work Cost (Rp/m). Where this model can explain 99.7% of the total project cost with a cost model factor of 1.038. The level of accuracy (percentage error estimate) of the estimation results of the Cost Significant Model in this study ranges from - 1.46% to +2.45%.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Earth and Environmental Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.