Abstract
The RF system is a key part of the 100MeV cyclotron in the project of Beijing radioactive ion-beam facility (BRIF), which includes RF generators, resonant cavities, transmission components, power supply and water cooling devices, computer control and so on. Two schemes are taken into account for the RF system design. One is to use a RF generator of 150kW to drive two 1/2 wavelength resonant cavities. The other is to use two RF generators of 100kW to drive two 1/2 wavelength resonant cavities, respectively. For the second scheme two Dee accelerating electrodes are disconnected in the central region, but their accelerating voltages are kept in phase with the help of phase shifters and phase lock loops.In this paper, the design strategy for the RF system, which is very important for high current machine, will be given firstly. And some design details, including the cavity simulation and test, amplifiers, the digital RF control, etc. will be described too.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.