Abstract
One long-span bridge adopted the cantilever casting method, which is pre-stressed concrete variable cross-section continuous box girder structure. In the construction process, due to the concrete pouring, hanging basket moving, construction loads, pre-stressed tension, concrete shrinkage and creep, temperature, humidity and many other factors. There will be such problems of cantilever beam segment closed error and the bridge line-type do not coincide in design goals. In this paper, we use the bridge dedicated finite element program MIDAS / Civil procedural for modeling and structural analysis. Analyze the problems of deflection control and pre-camber adjustment of cantilever construction, in order to ensure that the bridge closure smoothly in accordance with the design standards.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.