Abstract

During the twenty-year-overhaul of the Daya bay nuclear power plant unit 1 and unit 2, the overall transformation of the generator outlet circuit breaker was carried out, in which the synchronization device and the circuit is replacement and adjustment. In order to avoid the failure of non-synchronization, static and dynamic tests are required to verify the reliability of synchronization circuit, and finally it have been proved by test.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.