Abstract

The reconstruction of a small-scale production facility was designed and carried out in order to: a. conform to current requirements of Good Manufacturing Practices, especially to prevent contamination and mix-ups; b. make optimal use of the available area; c. provide for the possibility to carry out productions and development work at the same time.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call