Abstract

This paper examines the accuracy of cost estimates prepared by quantity surveyors during the design stages of construction projects. Since these estimates influence the feasibility and form of projects, the ability of quantity surveyors to fulfil the objectives of cost planning is considered. It concludes that the present methods of estimating used by quantity surveyors produce results which are not sufficiently accurate to meet all the objectives of cost planning. The most likely area for improvement lies in developing methods of using large cost data bases.&ei:

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.