Abstract

Three-dimensional finite element model of tunnel-soil-structures interaction was set up to analyze the causes of settlement and structural cracking when tunnel crossing complex gravelly soil area. It simulated the real tunnel excavation process of Chongqing Metro Line 3. Based on analysis and monitoring results, improved technical measures were used to control settlement, such as advance strengthening, excavation speed control and so on. The latest monitoring results indicate that vault and ground settlement are controlled, and convergence value is reduced significantly. The 3D numerical simulation analysis method provides reference for similar projects, and improvement of technical measures is conducive to settlement control.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.