Abstract

ABSTRACT In the last few years, chrono-urbanism has welcomed a novel perspective, namely, that of the 15-minute city concept, which has recently emerged in the present planning debate. During the current pandemic, this has coincided with a drive to highlight the importance of merging more activities in the neighbourhood to improve urban vitality and reduce daily commuting. In addition, increasing digitalization and knowledge-intensive activities have transformed the nature of work itself, thus affecting the choice of the workplace with new working spaces (NWS) emerging for collaborative and flexible work environments. Therefore, within this context, this study discusses recent chrono-urbanism approaches applied to urban planning and the role of NWS. The phenomenon is empirically examined in Oslo and Lisbon through a qualitative analysis of planning documents and a spatial analysis. The results show that most NWS are fairly accessible by public transport to users in both cities; although the NWS neighbourhoods in Lisbon have a greater diversity of functions compared to Oslo. However, in both cities, the distribution of NWS is non-uniform. This may limit residents’ choice to live and work (outside home) in the same neighbourhood. The study contributes to the current planning debate on new urban models for sustainable neighbourhoods.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.