Abstract

This paper describes testing of the INSIM-FT proxy simulation method (interwell-numerical-simulation model improved with front-tracking method) to assess the dependencies between production and injection wells, as well as to assess the forecast of oil/liquid production by wells depending on their operation parameters. The paper proposes the approach of taking into account the influence of various production enhancement operations. The method was tested on a synthetic hydrodynamic model and on a sector of a real field. The results show a good match between historical data and simulation results and indicate significant computational efficiency compared to classical reservoir simulators.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.