Abstract
The aim of this study was to test a tri-partite gas cooler for CO2 heat pumps (5-13 kW). The proposed heat exchanger allowed the simultaneous and separate production of space heating and domestic hot water with an integrated design, simplifying the heat pump layout and piping requirements. The experimental campaign was dedicated to the performance of the gas cooler at various operation conditions. These operation modes are: i) only space heating, ii) only domestic hot water iii) simultaneous production of domestic hot water and space heating. The results of the test campaigns were analysed in order to determine potential improvements or required redesign of the heat exchanger. The heat exchanger solution was integrated to novel prototype of tri-generation CO2 heat pump system.
Full Text
Topics from this Paper
Production Of Domestic Hot Water
Domestic Hot Water
Space Heating
Domestic Hot Water Heating
Production Of Hot Water
+ Show 5 more
Create a personalized feed of these topics
Get StartedTalk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Similar Papers
International Journal of Refrigeration
May 1, 2019
Energies
Dec 7, 2021
International Journal of Refrigeration
Feb 1, 2020
Energy
Mar 1, 2021
Solar Energy
Oct 1, 2016
International Journal of Refrigeration
Feb 1, 2018
IOP Conference Series: Earth and Environmental Science
Jan 1, 2019
Energy
Jul 1, 2018
International Journal of Refrigeration
Dec 1, 2005
Journal of Physics: Conference Series
Aug 1, 2020
Energy Procedia
Sep 1, 2017
Jan 1, 2019
New Ways to Save Energy
Jan 1, 1980
International Journal of Heat and Mass Transfer
Oct 1, 2021
Jan 1, 2015