Abstract

This paper demonstrates that reducing uncertainties in pile design and construction has the potential to greatly reduce foundation money and time costs for non-redundant driven and drilled pile foundations. It describes the statistics-guided Testing and Remediation Observational Method (TROM). This method permits reducing the factor of safety (FOS) in deterministic design, or increasing the resistance factor in load resistance factor design (LRFD), while maintaining a target reliability for all piles by remediating as needed. Three example case histories demonstrate the method and the advantages of testing every pile.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.