Abstract

The Central Solenoid Model Coil (CSMC) was designed and built by an ITER collaboration in 1993-2001. Three heavily instrumented Inserts have been also built for testing in the background field of the CSMC. The Nb/sub 3/Al Insert was designed and built by Japan to explore the feasibility of an alternative to Nb/sub 3/Sn superconductor for fusion magnets. The Nb/sub 3/Al Insert coil was tested in the CSMC Test Facility at the Japan Atomic Energy Research Institute, Naka, Japan in March-May 2002. It was the third Insert tested in this facility under this program. The Nb/sub 3/Al Insert coil was charged successfully without training in the background field of the CSMC to the design current of 46 kA at 13 T peak field and later was successfully charged up to 60 kA in 12.5 T field. This paper presents the test results overview.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call