This paper describes new test methods and some typical test results for ar ecently developed external insulation in Japan. The paper starts with the introduction of the results of the tests that were conducted specially on the external insulation for 1100 kV/lOGW ac transmission line and ±500 kV/12.8 GW dc overhead line section, recently constructed in Japan using heavy duty insulators, giant bushings, efc. Various special tests were made on the external insulation in order to investigate the performance at such high service voltages since those had never been used before, and secondly because of the high reliability required and the importance of the lines. Introduced next are test methods and some related results on long term performance for the new type of insulators, such as semiconducting glaze and polymer insulaton. Also included in the paper are the development of some special test methods and results on line arresters for transmission and distribution lines, which have been accepted widely in Japan.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.