Abstract

It is necessary to carry out functional test, equipment interconnection and interoperability verification and performance evaluation on the train control system before the deployment of the project. Combined with typical operation scenarios, the elements related to the scenarios are extracted based on existing simulation platform test scenarios, and the research on the relationship between typical scenarios and elements of railway operation train control system is carried out. The computational experiments based on typical scenarios and test cases are studied. Key technologies are analyzed, and test cases for typical operation scenarios are designed. The research can make the simulation process more targeted and the test results more valuable.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.