Abstract

The present standards for designing of ultra-long pile exist the contradiction between theory and practice; By combining the projects and finite element calculation and analyzing the characteristics of force and deformation, we can get the conclusion that there is asynchronous nature between the side resistance and the tip resistance in different soil layers. Meanwhile, the pile tip resistance has not been fully realized. To solve the above problems, I put forward reasonable proposals in order to make up for the deficiencies in designing. Introduction

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.