Abstract

The girder of prestressed concrete continuous box girder bridge strengthened by a stay cable system has a very complex deformation mechanism, and it is difficult to establish accurate numerical model for prediction. For these problems, a prediction method based on the combination of ant colony algorithm and residual combination correction model is proposed. In this method, the measuring points are considered as the cities in TSP ant colony algorithm, the information function model and heuristic function model are constructed, the pheromone update mechanism and ant search mechanism are established, and the deformation prediction of the main girder based on ant colony algorithm prediction model is achieved. On this basis, in order to fit the random change process of main girder deflection better, the periodic function generated by harmonic transform and sine function are introduced to modify the predicted results, which makes up for the low precision defect of single model. The results show that compared with finite element method, unequal interval gray model (1,1) (UIGM (1,1)), one-time residual correction UIGM (1,1), Markov chain residual correction UIGM (1,1), and ant colony algorithm model, this model can reflect the space-time effect and casual fluctuation feature of the development of girder deformation better and also has higher prediction accuracy and efficiency. The mean relative error of the predictive value is 3.39%, the posterior error ratio is 0.060, and the accuracy level reaches level 1. This model provides a new way for the girder deformation prediction of bridge strengthened by the stay cable system.

Highlights

  • It has become a worldwide problem that midspan lag and box girder cracks are common in prestressed concrete (PSC) continuous box girder bridges [1, 2]

  • The deformation of the main girder is predicted by programming; after multiple tests, it is determined that the overall performance of the ant colony algorithm prediction model is more balanced when Q=5000, α=3.0, β=4.0, and ρ=0.2

  • This paper regards the cable force data in tensioning phase as the original time sequences, regards the vertical deformation data obtained from the bridge floor survey points as the original date sequences, and builds the prediction model of main girder deformation strengthened by a stay cable system based on UIGM (1, 1) [22]

Read more

Summary

Introduction

It has become a worldwide problem that midspan lag and box girder cracks are common in prestressed concrete (PSC) continuous box girder bridges [1, 2]. The periodic sequence function and sine function generated by harmonic variation are used to fit the residual sequence, which is used to modify ant colony algorithm model prediction value and compensate the deflect of low precision of the single prediction model, so that the model could achieve a higher prediction accuracy. The effect of this model was verified by the measured data of the main girder in the tensioning phase. The example analysis shows that the prediction accuracy of this model is better than that of UIGM (1, 1) model and ant colony algorithm model; this model has a certain theoretical and engineering application value

Ant Colony Algorithm Prediction Model
Residual Combination Correction Model
Example Analyzing
Analysis Results
Conclusion
Full Text