Abstract

The feasibility of using crushed limestone instead of sand in cement grout is examined in this work. This study entails performing several tests, including the Brazilian test, the compressive strength test, and the stress-strain correlation test. The curing times used were 7, 14, and 28 days for mixtures with various proportions of cement to limestone (1:1, 1:2, and 1:4). The conventional sand-cement grout laboratory tests were prepared using a similar methodology to examine the effectiveness of the suggested substitute. The findings show that the limestone-based grout has sufficient strength, but that it is less than that of the typical sand material. The values of the tensile strength and elastic modulus were determined. A focus was made on the tensile strength and stress-strain relationship. A special laboratory set-up was used to look at the progress of failure using strain gauges fitted to the cylindrical samples both vertically and horizontally. The angular shape of the particles' ability to interlock is responsible for the material's increase in strength. According to this study, crushed limestone can be used as a substitute for sand in circumstances where sand supply is constrained. The suggested grout can be used in the shotcrete of tunnels and rock surfaces.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.