Abstract

The main girder of Dongming Huanghe River Highway Bridge was the first prestressed concrete (PC) continuous box girder bridge strengthened by a cable-stayed system in China. In order to study the temperature effect of the main girder structure of Dongming Huanghe River Highway Bridge after reinforcement, based on the measured data of middle span deflection, key section strain and typical crack width, the curve equations of strain and temperature of main girder were obtained by the regression analysis method. The results show that the annual strain value of main girder changed with the acquisition time in a sinusoidal function, and was linearly related to the temperature. The variation of mid-span deflection decreased gradually from side span to middle span, and varied dynamically with temperature in the whole girder, which also has obvious correlation with temperature. The crack width fluctuated up and down in a certain numerical range, which belonged to respiratory cracks and had equally correlation with temperature.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.